新地能源工程技术有限公司

Home >  Capacity & References >  Typical Cases >  Coal-Based Clean Energy Utilization

Tangshan Guye COG to LNG Project

Annual COG treatment capacity: 264 Million Nm3

Annual LNG capacity:104 Million Nm3


The project is located at Guye County, Tangshan City, Hebei Province. It consists of COG storage, purification, compression, desulfuration, and synthesis technology, synthetic NG liquefaction device and LNG tank truck loading station, as well as about 20 utilities and auxiliary equipment. It not only fill up the gap in natural gas supply in local area, but also reduces emission of greenhouse gases, and reasonably utilizes the resource of industrial exhaust, which assist our client to gain great economic and social benefits.


The project was put into operation at the end of 2013. 



Tangshan Guye COG to LNG Project



Tangshan Guye COG to LNG Project




Tangshan Guye COG to LNG Project


  • An Integrated Service Provider for Energy Clean Utilization
  • Human orientation, pursuit of excellence and harmonious coexistence
  • Innovate green energy engineering, Improve the quality of human life
About Us
Profile Culture Organization Responsibility
Technology Innovation
Natural Gas Purification Natural Gas Cryogenic Liquefaction Natural Gas Utilization Design Coal-Based Clean Energy Utilization LNG Receiving Terminal Energy-Saving & Environment Protection Equipment Integration Technology
Capacity & References
Qualifications Capacity Typical Cases Project List
Contact Us
Xindi Energy Engineering Technology Co., Ltd.
Block B, South District, Technology Park, No.118 Huaxiang Road, Langfang Development Zone, Langfang, Hebei Province
Fax:+86-316-2591234

Xindi Energy Engineering

link
中国竞彩网 宁夏体彩网 中国竞彩网 镇江市丹徒区旺诚机械有限公司 靖江市澳通门业有限公司 潍坊政凯机械有限公司 山东金岭集团有限公司 上海喆研机械制造有限公司 新地能源工程技术有限公司灵寿县永胜石材有限公司 新地能源工程技术有限公司江苏宏亚高空工程有限公司