新地能源工程技术有限公司

Home >  新地能源工程技术有限公司Capacity & References >  Typical Cases >  Coal-Based Clean Energy Utilization

Thangshan Tangsteel COG to LNG Project

Annual COG treatment capacity: 320 Million Nm3

Annual LNG capacity: 173 Million Nm3

High purity hydrogen extraction 16 Million Nm3/a


The project is located at Luanxian County Industrial Zone, Hebei Province。 It uses advanced technologies independently developed by Xindi, such as COG purification, methane synthesis, mixed refrigeration liquefaction, low temperature fractionation, and carbon addition to improve methane production and PSA  to extract hydrogen。

The project was successfully put into use in August 2014.



Thangshan Tangsteel COG to LNG Project 

  • An Integrated Service Provider for Energy Clean Utilization
  • Human orientation, pursuit of excellence and harmonious coexistence
  • Innovate green energy engineering, Improve the quality of human life
About Us
Profile Culture Organization Responsibility
Technology Innovation
Natural Gas Purification Natural Gas Cryogenic Liquefaction Natural Gas Utilization Design Coal-Based Clean Energy Utilization LNG Receiving Terminal Energy-Saving & Environment Protection Equipment Integration Technology
Capacity & References
Qualifications Capacity Typical Cases Project List
Contact Us
Xindi Energy Engineering Technology Co., Ltd.
Block B, South District, Technology Park, No.118 Huaxiang Road, Langfang Development Zone, Langfang, Hebei Province
Fax:+86-316-2591234

Xindi Energy Engineering

link
秒速赛车_永久网址9h123.com - 水立方冰场转换结构上午完工-中新网 江苏快三走势图 江苏11选5 皇冠篮球比分网 足球彩票 足球彩票 捕鱼大作战 捕鱼大作战 电竞比分网 篮球比分 篮球比分 皇冠足球比分 乐彩网 广东快乐十分走势图 四川快乐12走势图 浙江快乐12走势图 内蒙古快3 广西11选5 云南11选5 江西11选5 彩客网 500万彩票 搜狐彩票 手机捕鱼 抢庄牛牛 千炮捕鱼 雷速体育 七乐彩走势图 欧洲杯直播 三肖选一肖期期准 森林舞会游戏 天天斗地主